QUALITY CONTROL

** Measures Have Been Taken To Implement The Quality Plan
- Submittals
A listing of required submittals shall be developed and submitted for approval. Monthly updates of the submittal register shall be sent to construction manager.
- construction processes
All the construction processes shall be verified in accordance with the approved Contract drawings, method statements, inspection and test plan. Controlled conditions shall include the following:
· Method statement if necessary shall be in the form of documented work procedures/instructions defining the manner of construction and servicing. In case that construction without such procedures adversely affect quality of the product
· Monitoring and control of suitable process and product characteristics during construction.